Our Projects
-
Oman - 50 MW Wind Power Plant in Dhofar
Abu Dhabi Future Energy Company - Masdar is developing a 50 MW Wind Power Plant in Dhofar Governorate in the Saltant of Oman. The project consists of 13 turbines of the state-of-art GE wind technology, 2 substations and 13km OHL. The Project design, supply, construction and commissioning was awarded to an IPC consortium. The main stakeholders of this wind farm are RAECO as the future operator, OETC as the owner of the electricity transmission line and one substation, and OPWP as the procurer of the generated electricity from this wind power plant.
intec's services
Work Package 1: Assistance in bid evaluation (EPC and O&M):
- Evaluation of technical responsiveness, of the energy yield calculations provided in the bids, the proposed project schedule, warranties, deviations, and the O&M strategy
- Provision of technical support during contract negotiations
- Assistance in the preparation of the contract documents
Work Package 2: Project management consultancy services for design review, material approval, construction management and works supervision:
- Review of the power purchase agreement (PPA) and the transmission connection agreement (TCA)
- Review and approval of design
- Witnessing of FATs for the 132 kV OHL equipment, the 132 and 33 kV switchgears, the 132/33 kV power and auxiliary transformers, the wind energy converters and associated equipment, the cabling, and the protection and SCADA systems
- Monitoring of environmental management and health and safety plans
- Construction management and works supervision, and assistance in commissioning
Client
Abu Dhabi Future Energy Company – MASDARPeriod of implementation
04.2015 - 07.2019 -
Guinea - 60 kV Line Matoto - Kaloum and 110 kV Line from Matoto to Kaloum
The overall objective of the project consists of:
- Studying the feasibility of replacing the existing 60 kV line between Matoto and Kaloum with a 110 kV line
- Studying the feasibility of constructing a 110/20 kV primary substation at Sanoyah to feed the Kagbélen industrial zone and the distribution network of the Ansoumania zone
- An Environmental and Social Impact Assessment (ESIA) and Environmental and Social Management Plan (ESMP)
- Establishing the technical specifications and elaborating the tender dossier for the con-struction of the 110/20 kV primary substation at Sanoyah.
intec's services
- Determination of the optimum line route for the replacement of the 60 kV line Matoto - Kaloum with a new 110 kV line
- Study and determination of the substation boundaries for the construction of the 110/20 kV primary substation Sanoyah
- Determination of the technical specifications and elaboration of the tender dossier for the substation
- Design of the 110 kV line Matoto - Kaloum to replace the existing 60 kV line and for a substation with two lines and two transformers of 50 MVA each
- Detailed cost estimate for the facilities; including the environmental and social measures
- Estimate of all related risks and consideration of possible compensation measures
- Training
Client
Electricité de Guinée (EDG)Financing
French Development Agency (AFD)Period of implementation
06.2018 - 05.2019 - Studying the feasibility of replacing the existing 60 kV line between Matoto and Kaloum with a 110 kV line
-
Viet Nam - Solar PV plant Phuoc Thai 2 and 3 - Gap closing in the preparation phase
The project concept design prepared by the Project Executing Agency EVN provides for 200 MWp of solar generation in three phases. The Government of Vietnam has requested financing support from German Financial Cooperation via KfW.
Phase 1 provides for 50 MWp, including DC to 22 kV AC invertors, a control building, access roads and a new 2 x 125 MVA 220/22 step-up substation to interconnect with EVN´s existing 220 kV double circuit transmission line.
The subsequent Phases 2 (100 MWp) and 3 (50 MWp) under KfW funding will add an additional 150 MWp of solar generation in the selected areas.
intec's services
- Gap-closing on the technical pre-feasibility and feasibility study prepared by a local engineering consultant
- Due Diligence report
- Independent yield assessment, including a solar resource assessment
- Grid integration study (production curve, steady-state analysis, dynamic analysis, know-how transfer)
- Implementation concept and initial technical specifications
- Cost estimates
Client
KfW Development BankFinancing
KfW Development BankPeriod of implementation
06.2018 - 05.2019
Oman - 50 MW Wind Power Plant in Dhofar
Abu Dhabi Future Energy Company - Masdar is developing a 50 MW Wind Power Plant in Dhofar Governorate in the Saltant of Oman. The project consists of 13 turbines of the state-of-art GE wind technology, 2 substations and 13km OHL. The Project design, supply, construction and commissioning was awarded to an IPC consortium. The main stakeholders of this wind farm are RAECO as the future operator, OETC as the owner of the electricity transmission line and one substation, and OPWP as the procurer of the generated electricity from this wind power plant.
intec's services
Work Package 1: Assistance in bid evaluation (EPC and O&M):
- Evaluation of technical responsiveness, of the energy yield calculations provided in the bids, the proposed project schedule, warranties, deviations, and the O&M strategy
- Provision of technical support during contract negotiations
- Assistance in the preparation of the contract documents
Work Package 2: Project management consultancy services for design review, material approval, construction management and works supervision:
- Review of the power purchase agreement (PPA) and the transmission connection agreement (TCA)
- Review and approval of design
- Witnessing of FATs for the 132 kV OHL equipment, the 132 and 33 kV switchgears, the 132/33 kV power and auxiliary transformers, the wind energy converters and associated equipment, the cabling, and the protection and SCADA systems
- Monitoring of environmental management and health and safety plans
- Construction management and works supervision, and assistance in commissioning
Client
Abu Dhabi Future Energy Company – MASDARPeriod of implementation
04.2015 - 07.2019Guinea - 60 kV Line Matoto - Kaloum and 110 kV Line from Matoto to Kaloum
The overall objective of the project consists of:
- Studying the feasibility of replacing the existing 60 kV line between Matoto and Kaloum with a 110 kV line
- Studying the feasibility of constructing a 110/20 kV primary substation at Sanoyah to feed the Kagbélen industrial zone and the distribution network of the Ansoumania zone
- An Environmental and Social Impact Assessment (ESIA) and Environmental and Social Management Plan (ESMP)
- Establishing the technical specifications and elaborating the tender dossier for the con-struction of the 110/20 kV primary substation at Sanoyah.
intec's services
- Determination of the optimum line route for the replacement of the 60 kV line Matoto - Kaloum with a new 110 kV line
- Study and determination of the substation boundaries for the construction of the 110/20 kV primary substation Sanoyah
- Determination of the technical specifications and elaboration of the tender dossier for the substation
- Design of the 110 kV line Matoto - Kaloum to replace the existing 60 kV line and for a substation with two lines and two transformers of 50 MVA each
- Detailed cost estimate for the facilities; including the environmental and social measures
- Estimate of all related risks and consideration of possible compensation measures
- Training
Client
Electricité de Guinée (EDG)Financing
French Development Agency (AFD)Period of implementation
06.2018 - 05.2019Viet Nam - Solar PV plant Phuoc Thai 2 and 3 - Gap closing in the preparation phase
The project concept design prepared by the Project Executing Agency EVN provides for 200 MWp of solar generation in three phases. The Government of Vietnam has requested financing support from German Financial Cooperation via KfW.
Phase 1 provides for 50 MWp, including DC to 22 kV AC invertors, a control building, access roads and a new 2 x 125 MVA 220/22 step-up substation to interconnect with EVN´s existing 220 kV double circuit transmission line.
The subsequent Phases 2 (100 MWp) and 3 (50 MWp) under KfW funding will add an additional 150 MWp of solar generation in the selected areas.
intec's services
- Gap-closing on the technical pre-feasibility and feasibility study prepared by a local engineering consultant
- Due Diligence report
- Independent yield assessment, including a solar resource assessment
- Grid integration study (production curve, steady-state analysis, dynamic analysis, know-how transfer)
- Implementation concept and initial technical specifications
- Cost estimates
Client
KfW Development BankFinancing
KfW Development BankPeriod of implementation
06.2018 - 05.2019-
Burkina Faso - Fada N'Gourma Thermal Power Station
The project consists in the expansion of the production capacity of the Fada N'Gourma by in-stalling two new diesel generators (HFO) with an exploitable capacity of between 3.75 and 4.5 MW each.
intec's services
- Coordination, supervision and management of the contract
- Technical control of designs
- Factory acceptance testing
- Supervision of works execution on site
- Supervision of completion of works and commissioning
- Reporting
Client
Société Nationale d'Electricité du Burkina (SONABEL)Financing
World BankPeriod of implementation
2/2017 - 5/2019 -
UAE - 11 kV Power Distribution Network Design (Tawazun Industrial Park - TIP)
Tawazun Industrial Parkis in process for developing 11KV Substation and Cabling works in TIP which involves:
- Supply and Installation of 1500 KVA Package Substation including LV Panels and 11 KV Cablings - 4 to 7 nos based on Load Study.
- Supply and Installation of 3000KVA Substation Including LV Panels and 11KV Cablings - 1 nos
intec's services
Consultancy Services for 11 kV Power Distribution Network Design - 11/0.415 kV Distribution Substations and its associated 11 kV cabling works, 11 kV power supply loop cabling work between Primary Substation and IGT building at Tawazun Industrial Park (TIP), Abu Dhabi
Stage 1 covering:
- Load demand study
- Protection study (Upstream & Downstream)
- LDN development and submission to TIP
- Tender designs
Stage 2 covering:
- Development of tender documents
- Tendering support and Contractor’s Contract documentation covering pre- and post-bid clarifications and Technical & Commercial tender evaluation
Stage 3: Site Supervision
Client
Tawazun Industrial Park (TIP)Financing
Tawazun Industrial Park (TIP)Period of implementation
01.03.2018 - 30.05.2019 -
Jordan - 100 MW Wind Power Plant located at Tafilha 4
The objective of this assignment is to support the client throughout the development and implementation of the 100 MW wind power project, from procurement phase to the final acceptance and commercial operation date.
These services include amongst others design and engineering review, bid evaluation, project management, site supervision during construction and commissioning, factory inspections, reporting and scheduling, documentation and local logistic support.
intec's services
Phase 1:
- Preliminary document review and site visits
- Wind data analysis and wind resource assessment
- Support for the Environmental and Social Impact Assessment (ESIA)
- Power evacuation studies review
- Topographical survey review
- Assist the client to obtain the required permits and licenses
- Support during the procurement phase of the EPC and O&M contractors: support during bid evaluation and contract negotiations
- Draft of EPC and O&M contracts
Phase 2:
- Supervision of construction and commissioning
- Witnessing of Factory Acceptance Tests (FAT)
Client
Mass Jordan for Renewable Energy LtdFinancing
Mass Jordan for Renewable Energy LtdPeriod of implementation
15.1.2017 - 30.3.2019 -
Burkina Faso - Fada N'Gourma Thermal Power Station
The project consists in the expansion of the production capacity of the Fada N'Gourma by in-stalling two new diesel generators (HFO) with an exploitable capacity of between 3.75 and 4.5 MW each.
intec's services
- Coordination, supervision and management of the contract
- Technical control of designs
- Factory acceptance testing
- Supervision of works execution on site
- Supervision of completion of works and commissioning
- Reporting
Client
Société Nationale d'Electricité du Burkina (SONABEL)Financing
World BankPeriod of implementation
2/2017 - 5/2019UAE - 11 kV Power Distribution Network Design (Tawazun Industrial Park - TIP)
Tawazun Industrial Parkis in process for developing 11KV Substation and Cabling works in TIP which involves:
- Supply and Installation of 1500 KVA Package Substation including LV Panels and 11 KV Cablings - 4 to 7 nos based on Load Study.
- Supply and Installation of 3000KVA Substation Including LV Panels and 11KV Cablings - 1 nos
intec's services
Consultancy Services for 11 kV Power Distribution Network Design - 11/0.415 kV Distribution Substations and its associated 11 kV cabling works, 11 kV power supply loop cabling work between Primary Substation and IGT building at Tawazun Industrial Park (TIP), Abu Dhabi
Stage 1 covering:
- Load demand study
- Protection study (Upstream & Downstream)
- LDN development and submission to TIP
- Tender designs
Stage 2 covering:
- Development of tender documents
- Tendering support and Contractor’s Contract documentation covering pre- and post-bid clarifications and Technical & Commercial tender evaluation
Stage 3: Site Supervision
Client
Tawazun Industrial Park (TIP)Financing
Tawazun Industrial Park (TIP)Period of implementation
01.03.2018 - 30.05.2019Jordan - 100 MW Wind Power Plant located at Tafilha 4
The objective of this assignment is to support the client throughout the development and implementation of the 100 MW wind power project, from procurement phase to the final acceptance and commercial operation date.
These services include amongst others design and engineering review, bid evaluation, project management, site supervision during construction and commissioning, factory inspections, reporting and scheduling, documentation and local logistic support.
intec's services
Phase 1:
- Preliminary document review and site visits
- Wind data analysis and wind resource assessment
- Support for the Environmental and Social Impact Assessment (ESIA)
- Power evacuation studies review
- Topographical survey review
- Assist the client to obtain the required permits and licenses
- Support during the procurement phase of the EPC and O&M contractors: support during bid evaluation and contract negotiations
- Draft of EPC and O&M contracts
Phase 2:
- Supervision of construction and commissioning
- Witnessing of Factory Acceptance Tests (FAT)