Projects worldwide
intec has executed and is implementing large and complex projects in nearly all regions of the world.
The projects listed on the website represent only a handful of our references.
Our Projects
-
Georgia - 500 kV Jvari - Tskaltubo Overhead Transmission Line and Associated Substations
Georgia has set out a 10-year transmission network development plan. The construction of a new double-circuit 500 kV OHTL Jvari - Tskaltubo (about 70 km) and the construction of a new 500 kV switchyard in Tskaltubo Substation are among the top priority projects of this plan.
The present assignment aims at providing engineering, design and procurement support ser-vices to the Project Implementing Agency/the Client GSE to ensure timely implementation of the project.
intec's services
- Review of the existing project concept/preliminary design, cost estimates and schedule
- Preparation of tender documents, including technical specifications, for international competitive bidding (ICB) to select turnkey contractors for the works, using the ‘Standard Bidding Documents’ issued by the World Bank
- Preparation of bid evaluation reports, assistance in contract negotiations and preparation of con-tract documents
Client
Georgian State Electrosystem JSC (GSE)Financing
World BankPeriod of implementation
18.9.2017 - 31.5.2018 -
Jordan - Green Lending Programme in Jordan - Verification Consultant
AFD has designed a Green Lending Program aiming at scaling up investment by industry and service sectors in energy efficiency (EE), renewable energy (RE) and environmental performance. To this effect, the Green Lending program provides credits to Jordanian banks through the green credit facility, an investment grant scheme and financing of support frameworks for sustainable energy.
The monitoring and verification consultant, i.e. the present project, will ensure that the implemented investments meet the expectations, that all projects have been completed in accordance with the relevant investment plans and that they are on track to achieve the planned energy savings.
intec's services
Support to the implementation of a significant number of renewable energy and energy efficiency investments by:
checking the eligibility of projects
upon their completion checking the projects' compliance
recalculating the yield and business model of each PV project:
- car park systems of 5 kWp to 1 MWp
- roof-top systems of 25 kWp to 200 kWp
- green field systems of 500 kWp to 1 MWp
recalculating the efficiency of EE projects:
- assessment according to Jordanian Green Building Guideline
- certification according to LEED Gold Standard
(Sustainable sites, Water Efficiency, Energy and Atmosphere, indoor Environmental Quality, Materials and resources, Innovation in design)
monitoring and operational review of the projects
capitalizing the results of the program and ensure its visibility
Client
Agence Française de Développement (AFD)Financing
Agence Française de Développement (AFD)Period of implementation
23.5.2014 - 30.4.2018 -
Uganda - 10 MW PV Solar Project in Soroti District
The Netherlands Development Finance Company (FMO) invests into a 10 MW PV solar power project to be developed, owned and operated by the company Access Uganda Solar Limited. FMO contracted the services of a consultant to carry out lenders' technical, environmental and social due diligence of the project, construction supervision and monitoring of operational performance.
intec's services
Due Diligence Phase
- Project site assessment: topography, solar resource and ambient conditions; logistics; etc.
- Review of technology and plant design
- Review of energy yield analysis and forecasts for expected power production in kWh
- Review of project contracts / agreements (i.a. PPA, interconnection, O&M, water supply & land agreements)
- Review of construction and completion testing, of off-take structure (PPA) and of O&M structure
- Electrical interconnection review
- Check and follow-up of permits and licenses
- Review of expected project costs and of financial model assumptions
- Review of the project's environmental and social impact assessment (ESIA) process and report
- Summary of recommendations and proposed actions in a draft environmental and social action plan (ESAP)
Construction and Commissioning Phase
- Construction monitoring and quality assurance
- Design review and approval
- Review of acceptance testing procedures and test witnessing
- Participation in commissioning and taking-over
Operational Phase (services on call until 2032)
- Monitoring of punch list items, review of operational performance, periodical review of operation reports
Client
Netherlands Development Finance Company ("FMO")Financing
Access Uganda Solar LimitedPeriod of implementation
20/03/2015 – 31/03/2018
Georgia - 500 kV Jvari - Tskaltubo Overhead Transmission Line and Associated Substations
Georgia has set out a 10-year transmission network development plan. The construction of a new double-circuit 500 kV OHTL Jvari - Tskaltubo (about 70 km) and the construction of a new 500 kV switchyard in Tskaltubo Substation are among the top priority projects of this plan.
The present assignment aims at providing engineering, design and procurement support ser-vices to the Project Implementing Agency/the Client GSE to ensure timely implementation of the project.
intec's services
- Review of the existing project concept/preliminary design, cost estimates and schedule
- Preparation of tender documents, including technical specifications, for international competitive bidding (ICB) to select turnkey contractors for the works, using the ‘Standard Bidding Documents’ issued by the World Bank
- Preparation of bid evaluation reports, assistance in contract negotiations and preparation of con-tract documents
Client
Georgian State Electrosystem JSC (GSE)Financing
World BankPeriod of implementation
18.9.2017 - 31.5.2018Jordan - Green Lending Programme in Jordan - Verification Consultant
AFD has designed a Green Lending Program aiming at scaling up investment by industry and service sectors in energy efficiency (EE), renewable energy (RE) and environmental performance. To this effect, the Green Lending program provides credits to Jordanian banks through the green credit facility, an investment grant scheme and financing of support frameworks for sustainable energy.
The monitoring and verification consultant, i.e. the present project, will ensure that the implemented investments meet the expectations, that all projects have been completed in accordance with the relevant investment plans and that they are on track to achieve the planned energy savings.
intec's services
Support to the implementation of a significant number of renewable energy and energy efficiency investments by:
checking the eligibility of projects
upon their completion checking the projects' compliance
recalculating the yield and business model of each PV project:
- car park systems of 5 kWp to 1 MWp
- roof-top systems of 25 kWp to 200 kWp
- green field systems of 500 kWp to 1 MWp
recalculating the efficiency of EE projects:
- assessment according to Jordanian Green Building Guideline
- certification according to LEED Gold Standard
(Sustainable sites, Water Efficiency, Energy and Atmosphere, indoor Environmental Quality, Materials and resources, Innovation in design)
monitoring and operational review of the projects
capitalizing the results of the program and ensure its visibility
Client
Agence Française de Développement (AFD)Financing
Agence Française de Développement (AFD)Period of implementation
23.5.2014 - 30.4.2018Uganda - 10 MW PV Solar Project in Soroti District
The Netherlands Development Finance Company (FMO) invests into a 10 MW PV solar power project to be developed, owned and operated by the company Access Uganda Solar Limited. FMO contracted the services of a consultant to carry out lenders' technical, environmental and social due diligence of the project, construction supervision and monitoring of operational performance.
intec's services
Due Diligence Phase
- Project site assessment: topography, solar resource and ambient conditions; logistics; etc.
- Review of technology and plant design
- Review of energy yield analysis and forecasts for expected power production in kWh
- Review of project contracts / agreements (i.a. PPA, interconnection, O&M, water supply & land agreements)
- Review of construction and completion testing, of off-take structure (PPA) and of O&M structure
- Electrical interconnection review
- Check and follow-up of permits and licenses
- Review of expected project costs and of financial model assumptions
- Review of the project's environmental and social impact assessment (ESIA) process and report
- Summary of recommendations and proposed actions in a draft environmental and social action plan (ESAP)
Construction and Commissioning Phase
- Construction monitoring and quality assurance
- Design review and approval
- Review of acceptance testing procedures and test witnessing
- Participation in commissioning and taking-over
Operational Phase (services on call until 2032)
- Monitoring of punch list items, review of operational performance, periodical review of operation reports
Client
Netherlands Development Finance Company ("FMO")Financing
Access Uganda Solar LimitedPeriod of implementation
20/03/2015 – 31/03/2018-
Uganda - Independent Lenders' Advisor for a 10 MW PV Solar Project in Soroti District
The Netherlands Development Finance Company (FMO) invests into a 10 MW PV solar power project to be developed, owned and operated by the company Access Uganda Solar Limited. FMO contracted the services of a consultant to carry out lenders' technical, environmental and social due diligence of the project, construction supervision and monitoring of operational performance.
intec's services
The following Environmental and Social related services were provided in the framework of the project for a 10 MW PV Solar Project in Soroti District:
A. Due Diligence Phase
- Review of the project's environmental and social impact assessment (ESIA) process and report
- Preparation of a E&S Due diligence, including the review and assessment of corporate ESMS in relation to project construction and operation
- Summary of recommendations and proposed actions in a draft environmental and social action plan (ESAP)
B. Construction and Commissioning Phase
- Design review and approval, considering specific environment, social, health and safety requirements
- Verifying compliance with ESMMP
Client
Netherlands Development Finance Company ("FMO")Financing
Access Uganda Solar LimitedPeriod of implementation
03.2015 - 03.2018 -
Nigeria - HV Transmission Lines and Substations - PC-Lot 3(T)
Consultancy services for the supervision of the following EPC contracts:
- Lot 6-A: New 330/132/33 kV substation Owerri
- Lot 6-B: Line bay extension at 330 kV Alaoji Substation
- Lot 6-C: Project management for 330/132/33 kV Omoku Substation
- Lot 6-D: 330 kV DC line Omoku - Egbema
- Lot 6-E: 330 kV DC line Egbema - Owerri
- Lot 6-F: 330 kV DC line Ihiala - Nnewi
- Lot 6-H: Line bay extension at 330 kV Onitsha Substation
- Lot 6-I: 330 kV DC line Alaoji - Owerri
- Lot 23: New 132/33 kV substation Ubulusiuzor (Ihiala)
- Lot xx: 330/132 kV Nnewi Substation
intec's services
- Project coordination, management and supervision
- Tender evaluation, assistance during contract negotiations
- Technical control of designs
- Factory acceptance and acceptance of supplies to site
- Supervision of works on site
- Commissioning and trial runs
- Assistance during defects liability period
- Training and know-how transfer.
Client
Niger Delta Power Holding Company Ltd. (NDPHC)Financing
Niger Delta Power Holding Company Ltd. (NDPHC)Period of implementation
14.12.2005 - 30.3.2018 -
Côte d'Ivoire - Installation of Photovoltaic Generators in Abidjan
The "New Deal for Energy in Africa", launched by the African Development Bank, aims to make energy universally accessible by 2025. A progressive shift to low-carbon energy systems including renewable energies is planned in order to guarantee a green growth. The possibility of installing photovoltaic generators on the bank's site is explored within the framework of the introduction of renewable energy systems.
The Consultant's role is to perform the feasibility study for the installation of solar panels on the bank´s building and to prepare the technical methodology for the procurement of such works.
intec's services
The mission's objective for the Consultant is to evaluate the feasibility for the construction of photovoltaic generators both in technical and administrative terms:
- Site analysis (visit the identified zones and electrical installations of the bank's building, identification of the shaded areas, evaluation of technical and architectural constraints, etc.);
- Identification of administrative and regulatory constraints (possibility to obtain a building permit, cross public streets, connection of PV generators to the electricity grid, regulatory constraints, etc.);
- Sizing of high performance photovoltaic cells, adapted for the sites and setting of balances of power;
- Sizing of the bearing structures and of all the elements needed for the connection to the electricity grid or for off-grid operation of the PV generators;
- Cost estimate of all the works including the annual operating and maintenance costs for the installations;
- Elaboration of tender specifications;
- Drafting the final report of the study phase;
- Supervision of works and procurement;
- Drafting of the project's final report.
Client
African Development BankFinancing
African Development BankPeriod of implementation
15.11.2017 - 15.03.2018
Uganda - Independent Lenders' Advisor for a 10 MW PV Solar Project in Soroti District
The Netherlands Development Finance Company (FMO) invests into a 10 MW PV solar power project to be developed, owned and operated by the company Access Uganda Solar Limited. FMO contracted the services of a consultant to carry out lenders' technical, environmental and social due diligence of the project, construction supervision and monitoring of operational performance.
intec's services
The following Environmental and Social related services were provided in the framework of the project for a 10 MW PV Solar Project in Soroti District:
A. Due Diligence Phase
- Review of the project's environmental and social impact assessment (ESIA) process and report
- Preparation of a E&S Due diligence, including the review and assessment of corporate ESMS in relation to project construction and operation
- Summary of recommendations and proposed actions in a draft environmental and social action plan (ESAP)
B. Construction and Commissioning Phase
- Design review and approval, considering specific environment, social, health and safety requirements
- Verifying compliance with ESMMP
Client
Netherlands Development Finance Company ("FMO")Financing
Access Uganda Solar LimitedPeriod of implementation
03.2015 - 03.2018Nigeria - HV Transmission Lines and Substations - PC-Lot 3(T)
Consultancy services for the supervision of the following EPC contracts:
- Lot 6-A: New 330/132/33 kV substation Owerri
- Lot 6-B: Line bay extension at 330 kV Alaoji Substation
- Lot 6-C: Project management for 330/132/33 kV Omoku Substation
- Lot 6-D: 330 kV DC line Omoku - Egbema
- Lot 6-E: 330 kV DC line Egbema - Owerri
- Lot 6-F: 330 kV DC line Ihiala - Nnewi
- Lot 6-H: Line bay extension at 330 kV Onitsha Substation
- Lot 6-I: 330 kV DC line Alaoji - Owerri
- Lot 23: New 132/33 kV substation Ubulusiuzor (Ihiala)
- Lot xx: 330/132 kV Nnewi Substation
intec's services
- Project coordination, management and supervision
- Tender evaluation, assistance during contract negotiations
- Technical control of designs
- Factory acceptance and acceptance of supplies to site
- Supervision of works on site
- Commissioning and trial runs
- Assistance during defects liability period
- Training and know-how transfer.
Client
Niger Delta Power Holding Company Ltd. (NDPHC)Financing
Niger Delta Power Holding Company Ltd. (NDPHC)Period of implementation
14.12.2005 - 30.3.2018Côte d'Ivoire - Installation of Photovoltaic Generators in Abidjan
The "New Deal for Energy in Africa", launched by the African Development Bank, aims to make energy universally accessible by 2025. A progressive shift to low-carbon energy systems including renewable energies is planned in order to guarantee a green growth. The possibility of installing photovoltaic generators on the bank's site is explored within the framework of the introduction of renewable energy systems.
The Consultant's role is to perform the feasibility study for the installation of solar panels on the bank´s building and to prepare the technical methodology for the procurement of such works.
intec's services
The mission's objective for the Consultant is to evaluate the feasibility for the construction of photovoltaic generators both in technical and administrative terms:
- Site analysis (visit the identified zones and electrical installations of the bank's building, identification of the shaded areas, evaluation of technical and architectural constraints, etc.);
- Identification of administrative and regulatory constraints (possibility to obtain a building permit, cross public streets, connection of PV generators to the electricity grid, regulatory constraints, etc.);
- Sizing of high performance photovoltaic cells, adapted for the sites and setting of balances of power;
- Sizing of the bearing structures and of all the elements needed for the connection to the electricity grid or for off-grid operation of the PV generators;
- Cost estimate of all the works including the annual operating and maintenance costs for the installations;
- Elaboration of tender specifications;
- Drafting the final report of the study phase;
- Supervision of works and procurement;
- Drafting of the project's final report.