Training & Capacity Building - Project examples
-
Burundi - Hydropower Plant Rusumo Falls - Transmission Line Component (Burundi part of the regional project Burundi - Ruanda - Tanzania)
The "Regional Hydropower Plant Rusumo Falls" project was jointly developed by Burundi, Rwanda, and Tanzania. It includes the construction of a hydropower plant as well as the construction of 387 km of high-voltage lines and associated substations in the three countries (the present project).
In Burundi, services include detailed design and works supervision for the following:
- One 220 kV double-circuit transmission line of 161 km length, from the hydropower plant to the existing Gitega substation (double circuit, with steel groundwire and an OPGW on lattice steel towers);
- One new 220/30 kV substation at Muyinga, a new 220/110 kV substation at Gitega and its connection to the existing 130/30 kV substation at Gitega.
intec's services
intec contributes to the following tasks:
- Review of transmission line routes, angle towers and substations
- Final design
- Elaboration of technical specifications and tender documents
- Design review
- Control and supervision of works
- Tower acceptance testing
- Equipment acceptance testing
- Commissioning of equipment
- Reporting
Client
REGIDESO - Régie de Production et de Distribution d'Eau et d'ElectricitéFinancing
African Development Bank/European UnionPeriod of implementation
2016 - 2020 -
Libya - Strategic Plan for Renewable Energy Development
The situation of the electricity sector in Libya needs proper and rapid improvement, and the energy generation is mainly based on conventional energies burning heavy or light oil or gas fuel with a total installed generation capacity of around 9,000 MW mainly located in the shores north of the country. The use of renewable energies would allow Libya to cope with the increasing demand resulting from reconstruction of infrastructure destroyed during the last years and use oil & gas products to earn revenues for the country. The objective of this assignment is to develop a strategic plan for renewable energy development in the country.
intec's services
Stage I: Energy mix and renewable resource assessment
- development of a least cost expansion plan and renewable energy scenarios
Stage II: Strategic plan for development of renewable energy:
- analysis of institutional mechanism, procedures and processes for selection and licensing of RE projects
- develop a road map for RE and grid development until 2030 and estimate the size of investments required. The grid development roadmap includes the requirements for balancing reserve and proposes necessary power systems control infrastructure.
- summary of opportunities and interfaces of different set-ups
Stage III: Framework for a pilot private sector participation transaction
- develop technical specifications for Private Sector Participation (PSP) in wind and solar energy
- developing a grid code document for connecting renewable energy projects
- identify candidates for renewable energy PSP transactions
- analysis of the financial viability of the suggested pilot transactions
- conduct a risk assessment for PSP
- market analysis to identify interest in potential pilot projects
Stage IV: Specialized training and experience sharing workshops
Client
World BankFinancing
World BankPeriod of implementation
01/2017-12/2017; 05-06/2018 -
Nigeria - HV Transmission Lines and Substations - PC-Lot 3(T)
Consultancy services for the supervision of the following EPC contracts:
- Lot 6-A: New 330/132/33 kV substation Owerri
- Lot 6-B: Line bay extension at 330 kV Alaoji Substation
- Lot 6-C: Project management for 330/132/33 kV Omoku Substation
- Lot 6-D: 330 kV DC line Omoku - Egbema
- Lot 6-E: 330 kV DC line Egbema - Owerri
- Lot 6-F: 330 kV DC line Ihiala - Nnewi
- Lot 6-H: Line bay extension at 330 kV Onitsha Substation
- Lot 6-I: 330 kV DC line Alaoji - Owerri
- Lot 23: New 132/33 kV substation Ubulusiuzor (Ihiala)
- Lot xx: 330/132 kV Nnewi Substation
intec's services
- Project coordination, management and supervision
- Tender evaluation, assistance during contract negotiations
- Technical control of designs
- Factory acceptance and acceptance of supplies to site
- Supervision of works on site
- Commissioning and trial runs
- Assistance during defects liability period
- Training and know-how transfer.
Client
Niger Delta Power Holding Company Ltd. (NDPHC)Financing
Niger Delta Power Holding Company Ltd. (NDPHC)Period of implementation
14.12.2005 - 30.3.2018
Burundi - Hydropower Plant Rusumo Falls - Transmission Line Component (Burundi part of the regional project Burundi - Ruanda - Tanzania)
The "Regional Hydropower Plant Rusumo Falls" project was jointly developed by Burundi, Rwanda, and Tanzania. It includes the construction of a hydropower plant as well as the construction of 387 km of high-voltage lines and associated substations in the three countries (the present project).
In Burundi, services include detailed design and works supervision for the following:
- One 220 kV double-circuit transmission line of 161 km length, from the hydropower plant to the existing Gitega substation (double circuit, with steel groundwire and an OPGW on lattice steel towers);
- One new 220/30 kV substation at Muyinga, a new 220/110 kV substation at Gitega and its connection to the existing 130/30 kV substation at Gitega.
intec's services
intec contributes to the following tasks:
- Review of transmission line routes, angle towers and substations
- Final design
- Elaboration of technical specifications and tender documents
- Design review
- Control and supervision of works
- Tower acceptance testing
- Equipment acceptance testing
- Commissioning of equipment
- Reporting
Client
REGIDESO - Régie de Production et de Distribution d'Eau et d'ElectricitéFinancing
African Development Bank/European UnionPeriod of implementation
2016 - 2020Libya - Strategic Plan for Renewable Energy Development
The situation of the electricity sector in Libya needs proper and rapid improvement, and the energy generation is mainly based on conventional energies burning heavy or light oil or gas fuel with a total installed generation capacity of around 9,000 MW mainly located in the shores north of the country. The use of renewable energies would allow Libya to cope with the increasing demand resulting from reconstruction of infrastructure destroyed during the last years and use oil & gas products to earn revenues for the country. The objective of this assignment is to develop a strategic plan for renewable energy development in the country.
intec's services
Stage I: Energy mix and renewable resource assessment
- development of a least cost expansion plan and renewable energy scenarios
Stage II: Strategic plan for development of renewable energy:
- analysis of institutional mechanism, procedures and processes for selection and licensing of RE projects
- develop a road map for RE and grid development until 2030 and estimate the size of investments required. The grid development roadmap includes the requirements for balancing reserve and proposes necessary power systems control infrastructure.
- summary of opportunities and interfaces of different set-ups
Stage III: Framework for a pilot private sector participation transaction
- develop technical specifications for Private Sector Participation (PSP) in wind and solar energy
- developing a grid code document for connecting renewable energy projects
- identify candidates for renewable energy PSP transactions
- analysis of the financial viability of the suggested pilot transactions
- conduct a risk assessment for PSP
- market analysis to identify interest in potential pilot projects
Stage IV: Specialized training and experience sharing workshops
Client
World BankFinancing
World BankPeriod of implementation
01/2017-12/2017; 05-06/2018Nigeria - HV Transmission Lines and Substations - PC-Lot 3(T)
Consultancy services for the supervision of the following EPC contracts:
- Lot 6-A: New 330/132/33 kV substation Owerri
- Lot 6-B: Line bay extension at 330 kV Alaoji Substation
- Lot 6-C: Project management for 330/132/33 kV Omoku Substation
- Lot 6-D: 330 kV DC line Omoku - Egbema
- Lot 6-E: 330 kV DC line Egbema - Owerri
- Lot 6-F: 330 kV DC line Ihiala - Nnewi
- Lot 6-H: Line bay extension at 330 kV Onitsha Substation
- Lot 6-I: 330 kV DC line Alaoji - Owerri
- Lot 23: New 132/33 kV substation Ubulusiuzor (Ihiala)
- Lot xx: 330/132 kV Nnewi Substation
intec's services
- Project coordination, management and supervision
- Tender evaluation, assistance during contract negotiations
- Technical control of designs
- Factory acceptance and acceptance of supplies to site
- Supervision of works on site
- Commissioning and trial runs
- Assistance during defects liability period
- Training and know-how transfer.
Client
Niger Delta Power Holding Company Ltd. (NDPHC)Financing
Niger Delta Power Holding Company Ltd. (NDPHC)Period of implementation
14.12.2005 - 30.3.2018-
Regional- Africa-EU Renewable Energy Cooperation Programme (RECP)
The project will support the establishment of a clear and stable policy and regulatory framework in seven countries (Kenya, Mozambique, Nigeria, Senegal, Rwanda, Uganda and Zambia) in order to create a conductive environment for private investments in renewable energy projects and contribute to additional access to energy and a cleaner energy mix. It will address the most pressing bottlenecks along the policy cycle facing meso-scale renewable energy projects, both on- and off-grid.
The project aims to build capacity within the government, and supporting the formulation of private sector-oriented renewable energy policies and regulations, as well as their implementation. Activities will be at the instigation of both public and private sector, however will always be targeted at (and therefore must be ‘owned’ by) public sector institutions. Subjects will be prioritised based on the potential for decreasing barriers towards renewable energy investment in the country.
intec's services
Based on preliminary studies and an analysis of the political economy of the sector in each country, intec will identify activities, which will contribute to unlocking renewable energy opportunities, and formulate a national action plan for the duration of the project. The implementation of this action plan will be monitored and supported by a National Supervisory Board composed of representatives from the main public institutions of the sector. intec will play a key role in supporting the National Supervisory Board and public institutions formulate their needs and develop specific requests for activities. This will ensure appropriateness of the action plan and political ownership.
On the basis of the needs identified in the preliminary studies, six types of activities will be carried out:
- Providing a platform for policy interaction through Stakeholder Workshops;
- Enabling officials to learn from peers in other countries through Bilateral Exchanges;
- Providing the foundation for evidence-based decision making through Policy Studies;
- Building capacity of public institutions through Trainings;
- Assisting with drafting of policy and regulatory documents through Formulation Support;
- Assisting with realisation of policy objectives through Implementation Support.
Client
Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbHFinancing
Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbHPeriod of implementation
08/12/2016 - 28/02/2018 -
Guinea - Linsan - Fomi Transmission Line (CLSG / Rural Electrification Component Guinea)
The Linsan - Fomi transmission line project is one of the priority projects identified in the elec-trification masterplan of Guinea. The implementation of this line aims at ensuring a stable in-tegration of the national electricity networks of the ECOWAS member countries. At the same time, it serves to evacuate the power produced by the Kaleta Power Plant, the projected Souapiti HPP and other power plants to come.
The project covers the construction of approx. 394 km of 225 kV double-circuit transmission line between Linsan, Dabola, Kouroussa and Fomi with four associated 225 kV substations. It covers the following tasks:
- Line routing and production of maps, plans and profile drawings
- Environmental and Social Impact Assessment (ESIA)
- Elaboration of the Environmental and Social Management Plan (ESMP)
- Elaboration of the Resettlement Action Plan (RAP)
- Feasibility study for the line
- Preparation of functional prequalification and tender documents
- Training
intec's services
- Line routing and production of maps, plans and profile drawings
- Feasibility study, including:
- Technical interconnection study
- Economic, financial and sensitivity analyses and tariff proposal
- Risk analyses
- Training for the representatives of the projectparticipating parties on design of line interconnection and of transformer substations, and on the implementation of technical, economic and financial analyses
- Design and technical specifications for the line and the substations
- Preparation of functional prequalification and tender documents, and bid packaging
Client
Electricité de Guinée (EDG)Financing
African Development Bank (AfDB)Period of implementation
5.4.2017 - 4.2.2018 -
ECOWAS Region - Support to RE Flagship Projects
ECOWAS, the Economic Community of West African states, comprises 15 West African countries: Benin, Burkina Faso, Cabo Verde, Côte d'Ivoire, Gambia, Ghana, Guinea, Guinea-Bissau, Liberia, Mali, Niger, Nigeria, Senegal, Sierra Leone and Togo. The overall GIZ project supports the regional dissemination of experience concerning renewable energies and aims at improving the capacities of utilities in the long term.
Output Area B of the project "Generation - RE flagship projects" follows a two-pronged approach:
- Documentation of information on and experience with existing RE flagship projects;
- Support to the development of planned projects through technical assistance for project development and transaction advice, accompanied by documentation of experience.
intec's services
Provision and coordination of a pool of short-term experts to carry out the following tasks:
- Support to ECREEE in the process of screening, evaluating and prioritizing RE projects or promotion schemes
- Support to project developers and government representatives on technical, legal, financial and economic aspects of selected projects.
- Monitoring of selected projects during critical phases of their development and reporting of required action.
- Compilation of experiences with the selected projects and support to ECREEE / other institutions in the region in the dissemination of key findings and lessons learnt.
- Assistance to ECREEE and GIZ in supporting selected ECOWAS member states in creating an enabling legal, regulatory and administrative framework for grid-connected RE projects.
The above tasks cover PV, wind, small hydropower and biomass technology.
Client
ECREEE - ECOWAS Centre for Renewable Energy and Energy EfficiencyFinancing
Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbHPeriod of implementation
01.04.2015 - 15.12.2017
Regional- Africa-EU Renewable Energy Cooperation Programme (RECP)
The project will support the establishment of a clear and stable policy and regulatory framework in seven countries (Kenya, Mozambique, Nigeria, Senegal, Rwanda, Uganda and Zambia) in order to create a conductive environment for private investments in renewable energy projects and contribute to additional access to energy and a cleaner energy mix. It will address the most pressing bottlenecks along the policy cycle facing meso-scale renewable energy projects, both on- and off-grid.
The project aims to build capacity within the government, and supporting the formulation of private sector-oriented renewable energy policies and regulations, as well as their implementation. Activities will be at the instigation of both public and private sector, however will always be targeted at (and therefore must be ‘owned’ by) public sector institutions. Subjects will be prioritised based on the potential for decreasing barriers towards renewable energy investment in the country.
intec's services
Based on preliminary studies and an analysis of the political economy of the sector in each country, intec will identify activities, which will contribute to unlocking renewable energy opportunities, and formulate a national action plan for the duration of the project. The implementation of this action plan will be monitored and supported by a National Supervisory Board composed of representatives from the main public institutions of the sector. intec will play a key role in supporting the National Supervisory Board and public institutions formulate their needs and develop specific requests for activities. This will ensure appropriateness of the action plan and political ownership.
On the basis of the needs identified in the preliminary studies, six types of activities will be carried out:
- Providing a platform for policy interaction through Stakeholder Workshops;
- Enabling officials to learn from peers in other countries through Bilateral Exchanges;
- Providing the foundation for evidence-based decision making through Policy Studies;
- Building capacity of public institutions through Trainings;
- Assisting with drafting of policy and regulatory documents through Formulation Support;
- Assisting with realisation of policy objectives through Implementation Support.
Client
Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbHFinancing
Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbHPeriod of implementation
08/12/2016 - 28/02/2018Guinea - Linsan - Fomi Transmission Line (CLSG / Rural Electrification Component Guinea)
The Linsan - Fomi transmission line project is one of the priority projects identified in the elec-trification masterplan of Guinea. The implementation of this line aims at ensuring a stable in-tegration of the national electricity networks of the ECOWAS member countries. At the same time, it serves to evacuate the power produced by the Kaleta Power Plant, the projected Souapiti HPP and other power plants to come.
The project covers the construction of approx. 394 km of 225 kV double-circuit transmission line between Linsan, Dabola, Kouroussa and Fomi with four associated 225 kV substations. It covers the following tasks:
- Line routing and production of maps, plans and profile drawings
- Environmental and Social Impact Assessment (ESIA)
- Elaboration of the Environmental and Social Management Plan (ESMP)
- Elaboration of the Resettlement Action Plan (RAP)
- Feasibility study for the line
- Preparation of functional prequalification and tender documents
- Training
intec's services
- Line routing and production of maps, plans and profile drawings
- Feasibility study, including:
- Technical interconnection study
- Economic, financial and sensitivity analyses and tariff proposal
- Risk analyses
- Training for the representatives of the projectparticipating parties on design of line interconnection and of transformer substations, and on the implementation of technical, economic and financial analyses
- Design and technical specifications for the line and the substations
- Preparation of functional prequalification and tender documents, and bid packaging
Client
Electricité de Guinée (EDG)Financing
African Development Bank (AfDB)Period of implementation
5.4.2017 - 4.2.2018ECOWAS Region - Support to RE Flagship Projects
ECOWAS, the Economic Community of West African states, comprises 15 West African countries: Benin, Burkina Faso, Cabo Verde, Côte d'Ivoire, Gambia, Ghana, Guinea, Guinea-Bissau, Liberia, Mali, Niger, Nigeria, Senegal, Sierra Leone and Togo. The overall GIZ project supports the regional dissemination of experience concerning renewable energies and aims at improving the capacities of utilities in the long term.
Output Area B of the project "Generation - RE flagship projects" follows a two-pronged approach:
- Documentation of information on and experience with existing RE flagship projects;
- Support to the development of planned projects through technical assistance for project development and transaction advice, accompanied by documentation of experience.
intec's services
Provision and coordination of a pool of short-term experts to carry out the following tasks:
- Support to ECREEE in the process of screening, evaluating and prioritizing RE projects or promotion schemes
- Support to project developers and government representatives on technical, legal, financial and economic aspects of selected projects.
- Monitoring of selected projects during critical phases of their development and reporting of required action.
- Compilation of experiences with the selected projects and support to ECREEE / other institutions in the region in the dissemination of key findings and lessons learnt.
- Assistance to ECREEE and GIZ in supporting selected ECOWAS member states in creating an enabling legal, regulatory and administrative framework for grid-connected RE projects.
The above tasks cover PV, wind, small hydropower and biomass technology.
Client
ECREEE - ECOWAS Centre for Renewable Energy and Energy EfficiencyFinancing
Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbHPeriod of implementation
01.04.2015 - 15.12.2017-
Uganda - Mutundwe - Entebbe 132 kV Power Transmission Line and Related Substation Works
The project scope comprises the following:
- Construction of approximately 36 km of double circuit 132 kV transmission line between Mutundwe Substation near Kampala City and Entebbe, partly with four circuits and with OPGW on one circuit.
- Extension of the existing 132/33/11 kV Mutundwe Substation (two outgoing 132 kV feeders, extension of busbar system; extension/modification of protection, control, telecommunication, and auxiliary AC/DC power supply systems; civil works).
- Entebbe Substation: Construction of a new outdoor 132/33 kV substation and 33 kV indoor switchgear (double busbar system, two incoming 132 kV line feeders, two 132/33 kV transformer bays with 50 MVA power transformers, one bus coupler bay, protection, control and SCADA, tel-ecommunication and auxiliary power supply equipment, 33 kV indoor switchgear with two incom-ing and six outgoing feeders, a connection by 33 kV underground cable to the existing 33/11 kV distribution; control building, all related civil works).
intec's services
Project Design and Preparation of Tender Documents:
Review of the 2011 feasibility study report; review and adjustment of line route; pegging of angle towers; power system analysis with PSS/E; soil test report and project design report; elaboration of design and technical specifications for transmission line and substations; preparation of tender documents for EPC contracting.
Assistance during the Tendering Stage:
Lead of pre-bid meeting and site visit with Bidders; Bidder's clarifications; bid evaluation; post-tender clarifications; preparation of evaluation report; assistance during contract negotiations; preparation of EPC contracts.Project Management and Construction Supervision:
Review and approval of design calculations and drawings; factory acceptance and site tests; supervision of works on site; monitoring of time schedule; project cost control; processing of contractors' invoices; monitoring of environmental management plan and of the adherence of the social impact assessment recommendations; enforcement of contractor's health; safety and environmental manual; witnessing of commissioning tests; preparation of commissioning protocol; punch list; preparation of final inspection and formal takeover; review of as-built drawings; preparation of project reports.Follow-up during the two-year Defects Liability Period (DLP).
Training of Client's Personnel:
On-the-job training of electrical and civil engineers on power system analysis and design, on the preparation of specifications for transmission lines and substations and on supervision of construction works; elaboration of a detailed training programme and delivery of a 3-week training session for Client's Engineers in the Consultant's home office.
Client
Uganda Electricity Transmission Company Ltd. (UETCL)Financing
Kreditanstalt für Wiederaufbau (KfW)Period of implementation
26.3.2014 - 30.11.2017 -
Sierra Leone - Power Sector Roadmap and Coordination Activity
The Power Sector Roadmap and Coordination Activity is one of the components of the Electricity Sector Reform Project of the Sierra Leone Threshold Programme funded by the US Government through the Millennium Challenge Corporation. The Project objective is to support the Government’s efforts in the energy sector as well as advance the power sector reform agenda currently under implementation, and improve the effectiveness and viability of service provision through proper coordination.
The outcomes of this assignment will include the following modules:
Module 1: Define a Sector Roadmap and an Action Plan to Support the Power Sector Reform Process
Module 2: Support the development of a Power Sector Financial Framework
Module 3: Power Sector Reform Action Plan and Advisory Support
Module 4: Private Power Solicitation Framework
intec's services
Module 1: Define Sector Roadmap and Action Plan to Support Power Sector Reform Process
- Map existing power sector roles and responsibilities and perform a gap analysis
- Develop power sector reform roadmap
- Develop action plan for implementation of power sector roadmap
Module 2: Power Sector Financial Framework
- Support start-up of power sector collections account
- Develop power sector financial sustainability plan
Module 4: Develop a Private Power Solicitation Framework (with main focus on solar IPP)
- Process for the solicitation of IPPs
- Elaboration of contractual documents (implementation agreement including concessions and incentives, power purchase agreement (PPA), distribution and transmission agreement, land lease, generation license, and application for relevant environmental clearances)
- Develop a comprehensive IPP framework, defining of roles and responsibilities of the local public stakeholders
- Training in IPP framework
Client
The Government of Sierra LeoneFinancing
Millennium Challenge Corporation (MCC)Period of implementation
01.2017 – 11.2017 -
Zambia - Feasibility Study for Small Hydropower Station
Kafue Gorge Regional Training Centre (KGRTC), established in 1989, provides quality training to regional power utilities. KGRTC intended to develop a small hydropower station at Kafue Gorge with ancillary transmission structures, termination and connection to the grid. The station has been constructed between the existing Kafue Gorge Power Station dam site and the tailrace of the Kafue Gorge Lower Hydropower Station, the size of the SHPP shall be a result of the present feasibility study. The feasibility study led to the preparation of a full basic design and of tender documents for the procurement of an EPC contractor.
intec's services
- Review of existing pre-feasibility studies and related reports
- Hydrological studies and design
- Geological/geotechnical and seismicity investigations
- Selection and assessment of project alternatives and options
- Elaboration of project layouts and plans
- Specification of electro-mechanical equipment
- Design for selected option and cost estimates
- Power evacuation plans and details
- Economic and financial analysis
- Preparation of an Environmental and Social Impact Assessment (ESIA)
- Elaboration of the Feasibility Study Report
- Preparation of tender documents for procurement of an EPC contractor
- Training needs assessment, elaboration of training programme and schedule, conduction of training courses
Client
Kafue Gorge Regional Training Centre (KGRTC)Financing
Swedish International Development Cooperation AgencyPeriod of implementation
6.2015 - 10.2017
Uganda - Mutundwe - Entebbe 132 kV Power Transmission Line and Related Substation Works
The project scope comprises the following:
- Construction of approximately 36 km of double circuit 132 kV transmission line between Mutundwe Substation near Kampala City and Entebbe, partly with four circuits and with OPGW on one circuit.
- Extension of the existing 132/33/11 kV Mutundwe Substation (two outgoing 132 kV feeders, extension of busbar system; extension/modification of protection, control, telecommunication, and auxiliary AC/DC power supply systems; civil works).
- Entebbe Substation: Construction of a new outdoor 132/33 kV substation and 33 kV indoor switchgear (double busbar system, two incoming 132 kV line feeders, two 132/33 kV transformer bays with 50 MVA power transformers, one bus coupler bay, protection, control and SCADA, tel-ecommunication and auxiliary power supply equipment, 33 kV indoor switchgear with two incom-ing and six outgoing feeders, a connection by 33 kV underground cable to the existing 33/11 kV distribution; control building, all related civil works).
intec's services
Project Design and Preparation of Tender Documents:
Review of the 2011 feasibility study report; review and adjustment of line route; pegging of angle towers; power system analysis with PSS/E; soil test report and project design report; elaboration of design and technical specifications for transmission line and substations; preparation of tender documents for EPC contracting.
Assistance during the Tendering Stage:
Lead of pre-bid meeting and site visit with Bidders; Bidder's clarifications; bid evaluation; post-tender clarifications; preparation of evaluation report; assistance during contract negotiations; preparation of EPC contracts.
Project Management and Construction Supervision:
Review and approval of design calculations and drawings; factory acceptance and site tests; supervision of works on site; monitoring of time schedule; project cost control; processing of contractors' invoices; monitoring of environmental management plan and of the adherence of the social impact assessment recommendations; enforcement of contractor's health; safety and environmental manual; witnessing of commissioning tests; preparation of commissioning protocol; punch list; preparation of final inspection and formal takeover; review of as-built drawings; preparation of project reports.
Follow-up during the two-year Defects Liability Period (DLP).
Training of Client's Personnel:
On-the-job training of electrical and civil engineers on power system analysis and design, on the preparation of specifications for transmission lines and substations and on supervision of construction works; elaboration of a detailed training programme and delivery of a 3-week training session for Client's Engineers in the Consultant's home office.
Client
Uganda Electricity Transmission Company Ltd. (UETCL)Financing
Kreditanstalt für Wiederaufbau (KfW)Period of implementation
26.3.2014 - 30.11.2017Sierra Leone - Power Sector Roadmap and Coordination Activity
The Power Sector Roadmap and Coordination Activity is one of the components of the Electricity Sector Reform Project of the Sierra Leone Threshold Programme funded by the US Government through the Millennium Challenge Corporation. The Project objective is to support the Government’s efforts in the energy sector as well as advance the power sector reform agenda currently under implementation, and improve the effectiveness and viability of service provision through proper coordination.
The outcomes of this assignment will include the following modules:
Module 1: Define a Sector Roadmap and an Action Plan to Support the Power Sector Reform Process
Module 2: Support the development of a Power Sector Financial Framework
Module 3: Power Sector Reform Action Plan and Advisory Support
Module 4: Private Power Solicitation Framework
intec's services
Module 1: Define Sector Roadmap and Action Plan to Support Power Sector Reform Process
- Map existing power sector roles and responsibilities and perform a gap analysis
- Develop power sector reform roadmap
- Develop action plan for implementation of power sector roadmap
Module 2: Power Sector Financial Framework
- Support start-up of power sector collections account
- Develop power sector financial sustainability plan
Module 4: Develop a Private Power Solicitation Framework (with main focus on solar IPP)
- Process for the solicitation of IPPs
- Elaboration of contractual documents (implementation agreement including concessions and incentives, power purchase agreement (PPA), distribution and transmission agreement, land lease, generation license, and application for relevant environmental clearances)
- Develop a comprehensive IPP framework, defining of roles and responsibilities of the local public stakeholders
- Training in IPP framework
Client
The Government of Sierra LeoneFinancing
Millennium Challenge Corporation (MCC)Period of implementation
01.2017 – 11.2017Zambia - Feasibility Study for Small Hydropower Station
Kafue Gorge Regional Training Centre (KGRTC), established in 1989, provides quality training to regional power utilities. KGRTC intended to develop a small hydropower station at Kafue Gorge with ancillary transmission structures, termination and connection to the grid. The station has been constructed between the existing Kafue Gorge Power Station dam site and the tailrace of the Kafue Gorge Lower Hydropower Station, the size of the SHPP shall be a result of the present feasibility study. The feasibility study led to the preparation of a full basic design and of tender documents for the procurement of an EPC contractor.
intec's services
- Review of existing pre-feasibility studies and related reports
- Hydrological studies and design
- Geological/geotechnical and seismicity investigations
- Selection and assessment of project alternatives and options
- Elaboration of project layouts and plans
- Specification of electro-mechanical equipment
- Design for selected option and cost estimates
- Power evacuation plans and details
- Economic and financial analysis
- Preparation of an Environmental and Social Impact Assessment (ESIA)
- Elaboration of the Feasibility Study Report
- Preparation of tender documents for procurement of an EPC contractor
- Training needs assessment, elaboration of training programme and schedule, conduction of training courses