Viet Nam - Solar PV plant Phuoc Thai 2 and 3 - Gap closing in the preparation phase
The project concept design prepared by the Project Executing Agency EVN provides for 200 MWp of solar generation in three phases. The Government of Vietnam has requested financing support from German Financial Cooperation via KfW.
Phase 1 provides for 50 MWp, including DC to 22 kV AC invertors, a control building, access roads and a new 2 x 125 MVA 220/22 step-up substation to interconnect with EVN´s existing 220 kV double circuit transmission line.
The subsequent Phases 2 (100 MWp) and 3 (50 MWp) under KfW funding will add an additional 150 MWp of solar generation in the selected areas.
intec's services
- Gap-closing on the technical pre-feasibility and feasibility study prepared by a local engineering consultant
- Due Diligence report
- Independent yield assessment, including a solar resource assessment
- Grid integration study (production curve, steady-state analysis, dynamic analysis, know-how transfer)
- Implementation concept and initial technical specifications
- Cost estimates
Client
KfW Development BankFinancing
KfW Development BankPeriod of implementation
06.2018 - 05.2019 -
Mauritania - Development of the Eastern Zone Electricity Systems
The project included studies and works supervision services for the following technical measures:
- Construction of hybrid thermal power plants (PV) with related energy storage:
Néma Power Plant: 4 MW diesel, 2 MW solar PV, 500 kW energy storage,
Adel Bagrou Power Plant: 2 MW diesel, 1 MW solar PV, 250 kW energy storage.- Construction of 15, 33, 90 and 225 kV lines:
Centre line Néma - Achemim - Derouich Water Catchment Area (126 km line and MV/LV substations)
Centre line Néma - Amourj - Adel Bagrou - Boghle Water Catchment Area (3 lines with a total length of 255 km, and HV/LV substations)
Centre line Néma - Timbédra (170 km line and HV/LV substations)
Centre line Aioun - Doueirare (35 km line and HV/LV substations)- Reinforcement and development of new electricity distribution networks (0.4 - 33 kV).
intec's services
Phase 1: Studies and Assistance to the Client
- Execution of detailed engineering
- Execution of detailed design
- Establishment of tender documents
- Assistance to SOMELEC during the procurement phase, from tender launch to conclusion of the contracts with the Contractors
- Environmental and social impact assessment
Phase 2: Monitoring and Supervision of Works
- Monitoring of the implementation studies
Monitoring of equipment manufacturing
Participation in testing and factory acceptance tests (FATs)
Supervision and control of works
Monitoring the training of SOMELEC's staff
Client
SOMELECFinancing
Mauritanian GovernmentPeriod of implementation
03.2013 - 12.2018 -
Morocco - NOOR Midelt Solar Power Complex CSP Program
NOOR Midelt ("NOORM") is the second solar power complex to be developed in the framework of Morocco's NOOR Solar Plan. It covers an area of about 2,400 hectares and is located some 25 km northeast of the city of Midelt. The total capacity shall be between 800-1600 MW, and the plant will comprise different CSP and PV technologies.
The project covers the development of one or more projects under an independent power production (IPP) scheme. The pertinent consulting services are the following:
- Feasibility study, selection of preferred technologies and recommended project configuration, incl. the 225 kV grid connection
- Preparation of the Request for Pre-Qualification (RfQ) documents and management of the qualification process
- Preparation of 2-stage Request for Proposal (RfP) documents and management of the tendering procedure
- Bid evaluation, assistance during contract award and finalization of all project agreements.
- Grid study report: 850 MW solar PV/CSP integration into the Moroccan power system:
Grid connection layout
Static analysis
Dynamic analysis
Study of harmonics
Cost assessment grid connection
Overall assessment of the fluctuating power impact into the grid
Report preparation
- Industrialisation study
intec's services
intec leads the following project activities:
- Feasibility Study: site assessment and configuration, preliminary Environmental Impact Assessment (EIA) and Development Impact Assessment (DIA), final study report
- Preparation of RfQ document: definition of evaluation criteria, grid and methodology, final prequalification evaluation report
- Preparation of 2-stage RfP: planning of the overall bid process, technical bid evaluation report
- Contract award and agreements: contract negotiations and related documents
- Grid study report and extension of PV technology
- Industrialisation study in relation to Hybrid CSP/PV
Furthermore, it contributes to the following tasks:
- Economic and financial analysis for the feasibility study
- Technical input to the RfQ documents
- Preparation of the RfPs: technical specifications, project agreements, technical bid evaluation
- Energy economics calculation and comparisons PV/CSP versus CSP only
In addition, a team of experts is made available to carry out special assignments for MASEN.
Client
Moroccan Agency for Solar Energy (MASEN)Financing
MASENPeriod of implementation
31.12.2014 - 31.12.2018
Viet Nam - Solar PV plant Phuoc Thai 2 and 3 - Gap closing in the preparation phase
The project concept design prepared by the Project Executing Agency EVN provides for 200 MWp of solar generation in three phases. The Government of Vietnam has requested financing support from German Financial Cooperation via KfW.
Phase 1 provides for 50 MWp, including DC to 22 kV AC invertors, a control building, access roads and a new 2 x 125 MVA 220/22 step-up substation to interconnect with EVN´s existing 220 kV double circuit transmission line.
The subsequent Phases 2 (100 MWp) and 3 (50 MWp) under KfW funding will add an additional 150 MWp of solar generation in the selected areas.
intec's services
- Gap-closing on the technical pre-feasibility and feasibility study prepared by a local engineering consultant
- Due Diligence report
- Independent yield assessment, including a solar resource assessment
- Grid integration study (production curve, steady-state analysis, dynamic analysis, know-how transfer)
- Implementation concept and initial technical specifications
- Cost estimates
Client
KfW Development BankFinancing
KfW Development BankPeriod of implementation
06.2018 - 05.2019Mauritania - Development of the Eastern Zone Electricity Systems
The project included studies and works supervision services for the following technical measures:
- Construction of hybrid thermal power plants (PV) with related energy storage:
Néma Power Plant: 4 MW diesel, 2 MW solar PV, 500 kW energy storage,
Adel Bagrou Power Plant: 2 MW diesel, 1 MW solar PV, 250 kW energy storage.
- Construction of 15, 33, 90 and 225 kV lines:
Centre line Néma - Achemim - Derouich Water Catchment Area (126 km line and MV/LV substations)
Centre line Néma - Amourj - Adel Bagrou - Boghle Water Catchment Area (3 lines with a total length of 255 km, and HV/LV substations)
Centre line Néma - Timbédra (170 km line and HV/LV substations)
Centre line Aioun - Doueirare (35 km line and HV/LV substations)
- Reinforcement and development of new electricity distribution networks (0.4 - 33 kV).
intec's services
Phase 1: Studies and Assistance to the Client
- Execution of detailed engineering
- Execution of detailed design
- Establishment of tender documents
- Assistance to SOMELEC during the procurement phase, from tender launch to conclusion of the contracts with the Contractors
- Environmental and social impact assessment
Phase 2: Monitoring and Supervision of Works
- Monitoring of the implementation studies
Monitoring of equipment manufacturing
Participation in testing and factory acceptance tests (FATs)
Supervision and control of works
Monitoring the training of SOMELEC's staff
Client
SOMELECFinancing
Mauritanian GovernmentPeriod of implementation
03.2013 - 12.2018Morocco - NOOR Midelt Solar Power Complex CSP Program
NOOR Midelt ("NOORM") is the second solar power complex to be developed in the framework of Morocco's NOOR Solar Plan. It covers an area of about 2,400 hectares and is located some 25 km northeast of the city of Midelt. The total capacity shall be between 800-1600 MW, and the plant will comprise different CSP and PV technologies.
The project covers the development of one or more projects under an independent power production (IPP) scheme. The pertinent consulting services are the following:
- Feasibility study, selection of preferred technologies and recommended project configuration, incl. the 225 kV grid connection
- Preparation of the Request for Pre-Qualification (RfQ) documents and management of the qualification process
- Preparation of 2-stage Request for Proposal (RfP) documents and management of the tendering procedure
- Bid evaluation, assistance during contract award and finalization of all project agreements.
- Grid study report: 850 MW solar PV/CSP integration into the Moroccan power system:
Grid connection layout
Static analysis
Dynamic analysis
Study of harmonics
Cost assessment grid connection
Overall assessment of the fluctuating power impact into the grid
Report preparation
- Industrialisation study
intec's services
intec leads the following project activities:
- Feasibility Study: site assessment and configuration, preliminary Environmental Impact Assessment (EIA) and Development Impact Assessment (DIA), final study report
- Preparation of RfQ document: definition of evaluation criteria, grid and methodology, final prequalification evaluation report
- Preparation of 2-stage RfP: planning of the overall bid process, technical bid evaluation report
- Contract award and agreements: contract negotiations and related documents
- Grid study report and extension of PV technology
- Industrialisation study in relation to Hybrid CSP/PV
Furthermore, it contributes to the following tasks:
- Economic and financial analysis for the feasibility study
- Technical input to the RfQ documents
- Preparation of the RfPs: technical specifications, project agreements, technical bid evaluation
- Energy economics calculation and comparisons PV/CSP versus CSP only
In addition, a team of experts is made available to carry out special assignments for MASEN.
Client
Moroccan Agency for Solar Energy (MASEN)Financing
MASENPeriod of implementation
31.12.2014 - 31.12.2018-
Ukraine - South Ukraine Regional Transmission Network Development
NPC Ukrenergo aims at de-bottlenecking the regional network (up to 750 kV) in South Ukraine for more efficient and reliable power supply, plus accelerating the integration of solar and wind power into the national power grid within the next 15 years. The Consultant was appointed to assist NPC Ukrenergo to assess the implication of installing sizeable solar and wind power generation capacities in Ukraine.
The project is divided in two phases:
- Phase I: Regional Power Network Development Master Plan and Solar & Wind Power In-tegration Assessment
- Phase II - Project Preparation of Two Priority Investment Packages
The assignment has the following main tasks:
- Master planning of the regional power network development at 750, 330, 220 and 110 kV voltage levels in South Ukraine from a 5 and 15-year perspective
- Determination of the appropriate levels of wind and solar power capacity and appropriate operational and technical parameters for management of such connected capacity
- Drafting necessary documents regulating technical aspects of solar and wind energy operation in Ukraine
- Identifying the short and medium-term investments needed to strengthen the regional grid, and to increase the capacity of wind and solar power that could be connected in South Ukraine
- Determination of the required spare generating capacity in an interconnected power system (IPS) based on power balance analysis, type and operational parameters of such generating capacity to compensate fluctuating energy supply by large commercial-scale wind and solar power plants
- Prioritisation of construction/reinforcement projects to be implemented by 2030
- Strengthening the Client's capacity to perform better network planning and operation
- Performing comprehensive technical, economic, commercial and socio-environmental fea-sibility assessment of two projects to be prioritised among those identified in the master plan
- Project preparation for the two packages (technical specifications, BoQ, line route review, technical, economic and financial analyses, ESIA, project feasibility, project tender documentation)
intec's services
- Demand forecast and generation expansion plan
- Review and assessment of existing network planning and operation in view of solar and wind power integration (grid code, operation, load dispatch and wind forecast, control and metering systems)
- Network planning (110 kV and above) for the South Ukrainian grid for integration of solar and wind power (load flow, N-1, stability analysis, mitigation measures) and related training
- Establishment of a Geographical Information System (GIS)
- Preparation of the Master Plan with selection and definition of two priority investment packages
- Project preparation for the two packages (grid stability analysis, technical specifications, BoQ, line route review, technical, economic and financial analyses, ESIA, project feasibility, project tender documentation)
Client
NPC UkrenergoFinancing
European Bank for Reconstruction and Development (EBRD)Period of implementation
24.10.2012 - 22.12.2018 - Phase I: Regional Power Network Development Master Plan and Solar & Wind Power In-tegration Assessment
-
Madagascar - Renewable Energies Programme (PERER)
The GIZ Programme “Promotion of Electrification through Renewable Energies Programme” (PERER) aims to improve the framework conditions and regulations for private and public investment in electrification through renewable energy.
In this context, PERER together with the Malagasy Women Entrepreneur Association (Groupement des Femmes Entrepreneurs de Madagascar - GFEM) have initiated this project to strengthen the capacity of GFEM members in renewable energy and the positioning of women in this sector. It is also expected that the beneficiaries of the training programme will act as catalysts for the identification of energy efficiency measures and implementation of renewable energy solutions within their small or medium enterprises (SME).
Two workshops will be organised to inform women on the technologies linked to renewable energy and energy efficiency, as well as the related opportunities. In addition, three GFEM members will be selected and benefit from an energy audit to identify possible energy saving measures in their respective companies.
intec's services
In close cooperation with the GFEM and the team of GIZ-PERER, the following services are provided:
- Inform women entrepreneurs during a two-day workshop about the opportunities arising from the development of renewable energy and energy efficiency in Madagascar.
- Strengthen the capacity of GFEM members during a four-day workshop focused either on (i) solar energy, (ii) biomass-to-energy, or (iii) energy efficiency. For each technology, the module will deepen the following topics: technological potential and challenges, best practices, market needs, the creation of business plans and the risks involved.
- Design the selection criteria of SMEs which will benefit from the energy audit, score the applications and select three applicants.
- Conduct energy audits in the three enterprises using concrete proposals for a sustainable, efficient and effective management of energy use in each company in order to identify opportunities for optimal use of energy.
Client
Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) / Malagasy Women Entrepreneur Association (GFEM)Financing
Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbHPeriod of implementation
07.2018 - 11.2018 -
Gambia - Feasibility Study for Solar PV Development
The Republic of The Gambia, through the National Water and Electricity Company Limited- NAWEC (the Client), is seeking the development of Solar PV power generation in the country. The objective of the assignment is to assess the technical viability of constructing solar PV power generation in three potential modalities: (i) PV stand-alone power plant with a total installed capacity between 10 and 30 MWp including an associated BESS: (ii) hybridization of existing plants with PV power plants with BESS; and (iii) off grid PV + BESS for rural communities with major and critical health and educational facilities.
intec's services
- Project inception and implementation planning
- Analysis of existing grid and generation / demand profiles
- Solar resource assessment
- Site selection and feasibility studies for grid connected PV + BESS
- Pre-Feasibility studies for Off-Grid PV + BESS
- Market sounding
- Operation and maintenance program
- Training and capacity strengthening program
- Economic and financial analysis
- Risk analysis and mitigation plan
- Global environmental benefits
- Legal due diligence
- Preliminary analysis of environmental and social impacts
- Project structuring, project financing plan, EPC or PPP models.
Client
National Water and Electricity Company Limited (NAWEC)Financing
World BankPeriod of implementation
01.02.2018-30.09.2018
Ukraine - South Ukraine Regional Transmission Network Development
NPC Ukrenergo aims at de-bottlenecking the regional network (up to 750 kV) in South Ukraine for more efficient and reliable power supply, plus accelerating the integration of solar and wind power into the national power grid within the next 15 years. The Consultant was appointed to assist NPC Ukrenergo to assess the implication of installing sizeable solar and wind power generation capacities in Ukraine.
The project is divided in two phases:
- Phase I: Regional Power Network Development Master Plan and Solar & Wind Power In-tegration Assessment
- Phase II - Project Preparation of Two Priority Investment Packages
The assignment has the following main tasks:
- Master planning of the regional power network development at 750, 330, 220 and 110 kV voltage levels in South Ukraine from a 5 and 15-year perspective
- Determination of the appropriate levels of wind and solar power capacity and appropriate operational and technical parameters for management of such connected capacity
- Drafting necessary documents regulating technical aspects of solar and wind energy operation in Ukraine
- Identifying the short and medium-term investments needed to strengthen the regional grid, and to increase the capacity of wind and solar power that could be connected in South Ukraine
- Determination of the required spare generating capacity in an interconnected power system (IPS) based on power balance analysis, type and operational parameters of such generating capacity to compensate fluctuating energy supply by large commercial-scale wind and solar power plants
- Prioritisation of construction/reinforcement projects to be implemented by 2030
- Strengthening the Client's capacity to perform better network planning and operation
- Performing comprehensive technical, economic, commercial and socio-environmental fea-sibility assessment of two projects to be prioritised among those identified in the master plan
- Project preparation for the two packages (technical specifications, BoQ, line route review, technical, economic and financial analyses, ESIA, project feasibility, project tender documentation)
intec's services
- Demand forecast and generation expansion plan
- Review and assessment of existing network planning and operation in view of solar and wind power integration (grid code, operation, load dispatch and wind forecast, control and metering systems)
- Network planning (110 kV and above) for the South Ukrainian grid for integration of solar and wind power (load flow, N-1, stability analysis, mitigation measures) and related training
- Establishment of a Geographical Information System (GIS)
- Preparation of the Master Plan with selection and definition of two priority investment packages
- Project preparation for the two packages (grid stability analysis, technical specifications, BoQ, line route review, technical, economic and financial analyses, ESIA, project feasibility, project tender documentation)
Client
NPC UkrenergoFinancing
European Bank for Reconstruction and Development (EBRD)Period of implementation
24.10.2012 - 22.12.2018Madagascar - Renewable Energies Programme (PERER)
The GIZ Programme “Promotion of Electrification through Renewable Energies Programme” (PERER) aims to improve the framework conditions and regulations for private and public investment in electrification through renewable energy.
In this context, PERER together with the Malagasy Women Entrepreneur Association (Groupement des Femmes Entrepreneurs de Madagascar - GFEM) have initiated this project to strengthen the capacity of GFEM members in renewable energy and the positioning of women in this sector. It is also expected that the beneficiaries of the training programme will act as catalysts for the identification of energy efficiency measures and implementation of renewable energy solutions within their small or medium enterprises (SME).
Two workshops will be organised to inform women on the technologies linked to renewable energy and energy efficiency, as well as the related opportunities. In addition, three GFEM members will be selected and benefit from an energy audit to identify possible energy saving measures in their respective companies.
intec's services
In close cooperation with the GFEM and the team of GIZ-PERER, the following services are provided:
- Inform women entrepreneurs during a two-day workshop about the opportunities arising from the development of renewable energy and energy efficiency in Madagascar.
- Strengthen the capacity of GFEM members during a four-day workshop focused either on (i) solar energy, (ii) biomass-to-energy, or (iii) energy efficiency. For each technology, the module will deepen the following topics: technological potential and challenges, best practices, market needs, the creation of business plans and the risks involved.
- Design the selection criteria of SMEs which will benefit from the energy audit, score the applications and select three applicants.
- Conduct energy audits in the three enterprises using concrete proposals for a sustainable, efficient and effective management of energy use in each company in order to identify opportunities for optimal use of energy.
Client
Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) / Malagasy Women Entrepreneur Association (GFEM)Financing
Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbHPeriod of implementation
07.2018 - 11.2018Gambia - Feasibility Study for Solar PV Development
The Republic of The Gambia, through the National Water and Electricity Company Limited- NAWEC (the Client), is seeking the development of Solar PV power generation in the country. The objective of the assignment is to assess the technical viability of constructing solar PV power generation in three potential modalities: (i) PV stand-alone power plant with a total installed capacity between 10 and 30 MWp including an associated BESS: (ii) hybridization of existing plants with PV power plants with BESS; and (iii) off grid PV + BESS for rural communities with major and critical health and educational facilities.
intec's services
- Project inception and implementation planning
- Analysis of existing grid and generation / demand profiles
- Solar resource assessment
- Site selection and feasibility studies for grid connected PV + BESS
- Pre-Feasibility studies for Off-Grid PV + BESS
- Market sounding
- Operation and maintenance program
- Training and capacity strengthening program
- Economic and financial analysis
- Risk analysis and mitigation plan
- Global environmental benefits
- Legal due diligence
- Preliminary analysis of environmental and social impacts
- Project structuring, project financing plan, EPC or PPP models.
Client
National Water and Electricity Company Limited (NAWEC)Financing
World BankPeriod of implementation
01.02.2018-30.09.2018-
Tanzania - Zanzibar Renewable Energies and Energy Efficiency Programme
The EU has formulated a comprehensive programme to support the RE and EE Initiative in Zanzibar. This includes the supply and installation of wind and solar measurement equipment (separately contracted) and the recruitment of consultancy services for the implementation of the programme in 2 lots: the present study work (Lot 1) and technical assistance for the implementation of RE and EE projects to be separately contracted as Lot 2.
intec's services
- Collection and analysis of wind and solar resource data for a period of 12 months resulting in a wind map for the archipelago, in the confirmation of 5 wind sites and of 3 solar farm sites for feasibility analyses
- Grid impact study: load flow, static and dynamic analysis, maximum penetration estimation, capacity factor calculation, estimation of needed rotational reserve and report preparation.
- Logistics study for wind parks and solar farms (harbour/landing facilities, transport and construction equipment, access roads, etc.; development of a logistics plan)
- Wind flow modelling for selected sites and solar PV potential, inter alia development of a digital terrain model (DTM) for the pre-selected sites
- Output prediction for wind parks and solar PV farms incl. selection of wind turbines and PV panels to consider, loss and risk analyses
- Feasibility studies for wind parks, solar farms and solar home systems (SHS), incl. preliminary project designs and cost estimates, grid integration studies (33 kV), SCADA, civil engineering, financial and economic analyses, preliminary standardized design of SHS, and procurement and construction schedule
- Evaluation of regulatory requirements (permits and licenses, land use, laws on construction and operation of wind parks and solar farms)
- Environmental and social impact assessments (EIA and SIA), including development of an environmental monitoring and management plan (EMMP)
Client
The Alternate National Authorizing Officer (NAO), Ministry of FinanceFinancing
European CommissionPeriod of implementation
1.8.2015 - 01.09.2018 -
Uganda - 10 MW PV Solar Project in Tororo District
The Netherlands Development Finance Company (FMO) invests into a 10 MW PV solar power project to be developed, owned and operated by the company Tororo Solar North Ltd. (TSN). FMO contracted the services of a consultant to carry out lenders' technical, environmental and social due diligence of the project, construction supervision and monitoring of operational performance.
intec's services
A. Due Diligence Phase
- Project site assessment: topography, solar resource and ambient conditions; logistics; etc.
- Review of technology and plant design
- Review of energy yield analysis and forecasts for expected power production in kWh
- Review of project contracts / agreements (i.a. PPA, interconnection, O&M, water supply & land agreements)
- Review of construction and completion testing, of off-take structure (PPA) and of O&M structure
- Electrical interconnection review
- Check and follow-up of permits and licenses
- Review of expected project costs and of financial model assumptions
- Review of the project's environmental and social impact assessment (ESIA) process and report
- Summary of recommendations and proposed actions in a draft environmental and social action plan (ESAP)
B. Construction and Commissioning Phase
- Construction monitoring and quality assurance
- Design review and approval
- Review of acceptance testing procedures and test witnessing
- Participation in commissioning and taking-over
C. Operational Phase (services on call until 2032)
Monitoring of punch list items, review of operational performance, periodical review of operation reports
Client
Netherlands Development Finance Company ("FMO")Financing
Access Uganda Solar LimitedPeriod of implementation
20.3.2015 - 31.7.2018 -
Niger - PV Hybridization of Diesel-Based Mini-Grids in Niger
The Government of Niger has been striving to increase electricity access and has set an ambitious goal of increasing the access rate to 60% by 2027. The objective of this assignment is to conduct the feasibility study of the hybridization with PV and expansion of access to electricity of several existing diesel-based isolated grids throughout Niger and managed by NIGELEC.
intec's services
- Georeferencing and analysis (GIS) of mini grids managed by NIGELEC
- Analysis of hybridization options and potential for grid expansion and access increase of access to electricity
- Elaboration of pre-feasibility study of the selected isolated grids
- Mid-term workshop to select final set for feasibility studies
- Site visit to each of the selected isolated grids at the feasibility stage, including demand assessment
- Elaboration of feasibility study of the selected isolated grids
- Training with national stakeholders
Client
World BankFinancing
World BankPeriod of implementation
02.11.2016 - 30.06.2018
Tanzania - Zanzibar Renewable Energies and Energy Efficiency Programme
The EU has formulated a comprehensive programme to support the RE and EE Initiative in Zanzibar. This includes the supply and installation of wind and solar measurement equipment (separately contracted) and the recruitment of consultancy services for the implementation of the programme in 2 lots: the present study work (Lot 1) and technical assistance for the implementation of RE and EE projects to be separately contracted as Lot 2.
intec's services
- Collection and analysis of wind and solar resource data for a period of 12 months resulting in a wind map for the archipelago, in the confirmation of 5 wind sites and of 3 solar farm sites for feasibility analyses
- Grid impact study: load flow, static and dynamic analysis, maximum penetration estimation, capacity factor calculation, estimation of needed rotational reserve and report preparation.
- Logistics study for wind parks and solar farms (harbour/landing facilities, transport and construction equipment, access roads, etc.; development of a logistics plan)
- Wind flow modelling for selected sites and solar PV potential, inter alia development of a digital terrain model (DTM) for the pre-selected sites
- Output prediction for wind parks and solar PV farms incl. selection of wind turbines and PV panels to consider, loss and risk analyses
- Feasibility studies for wind parks, solar farms and solar home systems (SHS), incl. preliminary project designs and cost estimates, grid integration studies (33 kV), SCADA, civil engineering, financial and economic analyses, preliminary standardized design of SHS, and procurement and construction schedule
- Evaluation of regulatory requirements (permits and licenses, land use, laws on construction and operation of wind parks and solar farms)
- Environmental and social impact assessments (EIA and SIA), including development of an environmental monitoring and management plan (EMMP)
Client
The Alternate National Authorizing Officer (NAO), Ministry of FinanceFinancing
European CommissionPeriod of implementation
1.8.2015 - 01.09.2018Uganda - 10 MW PV Solar Project in Tororo District
The Netherlands Development Finance Company (FMO) invests into a 10 MW PV solar power project to be developed, owned and operated by the company Tororo Solar North Ltd. (TSN). FMO contracted the services of a consultant to carry out lenders' technical, environmental and social due diligence of the project, construction supervision and monitoring of operational performance.
intec's services
A. Due Diligence Phase
- Project site assessment: topography, solar resource and ambient conditions; logistics; etc.
- Review of technology and plant design
- Review of energy yield analysis and forecasts for expected power production in kWh
- Review of project contracts / agreements (i.a. PPA, interconnection, O&M, water supply & land agreements)
- Review of construction and completion testing, of off-take structure (PPA) and of O&M structure
- Electrical interconnection review
- Check and follow-up of permits and licenses
- Review of expected project costs and of financial model assumptions
- Review of the project's environmental and social impact assessment (ESIA) process and report
- Summary of recommendations and proposed actions in a draft environmental and social action plan (ESAP)
B. Construction and Commissioning Phase
- Construction monitoring and quality assurance
- Design review and approval
- Review of acceptance testing procedures and test witnessing
- Participation in commissioning and taking-over
C. Operational Phase (services on call until 2032)
Monitoring of punch list items, review of operational performance, periodical review of operation reports
Client
Netherlands Development Finance Company ("FMO")Financing
Access Uganda Solar LimitedPeriod of implementation
20.3.2015 - 31.7.2018Niger - PV Hybridization of Diesel-Based Mini-Grids in Niger
The Government of Niger has been striving to increase electricity access and has set an ambitious goal of increasing the access rate to 60% by 2027. The objective of this assignment is to conduct the feasibility study of the hybridization with PV and expansion of access to electricity of several existing diesel-based isolated grids throughout Niger and managed by NIGELEC.
intec's services
- Georeferencing and analysis (GIS) of mini grids managed by NIGELEC
- Analysis of hybridization options and potential for grid expansion and access increase of access to electricity
- Elaboration of pre-feasibility study of the selected isolated grids
- Mid-term workshop to select final set for feasibility studies
- Site visit to each of the selected isolated grids at the feasibility stage, including demand assessment
- Elaboration of feasibility study of the selected isolated grids
- Training with national stakeholders