Ukraine - 750 kV Zaporizhzhia - Kahovska Transmission Line
The present project is part of the Energy Strategy of Ukraine to 2030 and is aimed at improving the regional power system efficiency, stability and reliability on the Crimean peninsula. It consists of the construction of a 750 kV OHL from Zaporizhzhia Substation to the new Kakhovska Substation and related 330 kV connections, as follows:
- Construction of a 190 km of 750 kV transmission line between Zaporizhzhia NPP and Kakhovska Substation with fibre optic and maintenance workshop
- Construction of a new 750/330/220 kV Substation at Kakhovska, with two 1000 MVA automatic transformers and automatic control system
- Constructing the diversion of the existing 330 kV Novokakhovska - Ostrovska line (2 x 27 km), incl. rehabilitation of the 330 kV Ostrovska Substation, replacement of relay protection and automatics, communication devices, the construction of a control unit at Novokakhovska Substation and the installation of the fibre-optic system Novokakhovska - Kakhovska
- Constructing the diversion of the existing 330 kV Novokakhovska - Kherson line (2 x 15 km), incl. rehabilitation of the 330 kV Khersonska Substation, and the installation of the fibre-optic system from Kakhovska - Khersonska
intec's services
- Assistance to Ukrenergo during the tender stage (preparation of pre-qualification and tender documents, assistance during pre-qualification and tendering stages, and assistance in contract preparation)
- Technical and legal assistance during contracts' execution (review of the design and its compliance with the ESAP, supervision of contractors' works, assistance in project management, assistance during DLP)
- Assistance in loan agreement management (drafting of project implementation plan and all necessary reporting, assistance for disbursement to contractors)
- Assistance in the implementation of the ESAP/ESMPP
- Monitoring of the adherence to health and safety standards
Client
NEC UkrenergoFinancing
EBRDPeriod of implementation
07.2011 - 10.2016; 03.2018 – 08.2018 -
Uganda - Independent Lenders' Advisor for a 10 MW PV Solar Project in Soroti District
The Netherlands Development Finance Company (FMO) invests into a 10 MW PV solar power project to be developed, owned and operated by the company Access Uganda Solar Limited. FMO contracted the services of a consultant to carry out lenders' technical, environmental and social due diligence of the project, construction supervision and monitoring of operational performance.
intec's services
The following Environmental and Social related services were provided in the framework of the project for a 10 MW PV Solar Project in Soroti District:
A. Due Diligence Phase
- Review of the project's environmental and social impact assessment (ESIA) process and report
- Preparation of a E&S Due diligence, including the review and assessment of corporate ESMS in relation to project construction and operation
- Summary of recommendations and proposed actions in a draft environmental and social action plan (ESAP)
B. Construction and Commissioning Phase
- Design review and approval, considering specific environment, social, health and safety requirements
- Verifying compliance with ESMMP
Client
Netherlands Development Finance Company ("FMO")Financing
Access Uganda Solar LimitedPeriod of implementation
03.2015 - 03.2018 -
Mali - PASE - Extension of EDM's Transmission and Distribution Networks
The project was part of the ‘PASE’ (Project for the Support to the Energy Sector) for which the World Bank granted a loan to the Government of Mali. The project in general aimed at improving access to electricity, as well as efficiency in the supply and utilisation of electrical energy. The project’s technical measures included the following components:
- Extension of the MV/LV networks in Bamako and Kati
- Construction of the 30 kV Kati Substation
- Reinforcement and extension of the MV/LV networks in Kayes, Sikasso, Koutiala, and Ségou
- Rehabilitation of the 150 kV lines Bamako – Fana, Fana – Ségou, and restructuring of Fana substation connection from T-off to line-in/line-out arrangement
- Extension of the Kalabancoro Substation (transformer 60 MVA, 150/30 kV) and renewal of the 30/15 kV Sotuba Substation
- Extension of the 15 kV SOGEM Substation in Kodialani and installation of 15 kV outgoing feeders
- Installation of the second circuit on the 150 kV Kodialani - Sirakoro line
intec's services
- Overall project management and home-office back-up support for specific tasks
- Coordination of the detailed implementation plan with EDM
- Approval of technical documents and implementation studies
- Technical control of plans and documents
- Factory acceptance tests, monitoring and quality control of manufacturing
- Site supervision
- Budget control and management
- Implementation of the quality management plan and the health and safety plans
- Verification of the environmental protection plan
- Reporting
Client
Energie du Mali S.A. (EDM)Financing
International Development Association (IDA)Period of implementation
02.2014 - 07.2016
Ukraine - 750 kV Zaporizhzhia - Kahovska Transmission Line
The present project is part of the Energy Strategy of Ukraine to 2030 and is aimed at improving the regional power system efficiency, stability and reliability on the Crimean peninsula. It consists of the construction of a 750 kV OHL from Zaporizhzhia Substation to the new Kakhovska Substation and related 330 kV connections, as follows:
- Construction of a 190 km of 750 kV transmission line between Zaporizhzhia NPP and Kakhovska Substation with fibre optic and maintenance workshop
- Construction of a new 750/330/220 kV Substation at Kakhovska, with two 1000 MVA automatic transformers and automatic control system
- Constructing the diversion of the existing 330 kV Novokakhovska - Ostrovska line (2 x 27 km), incl. rehabilitation of the 330 kV Ostrovska Substation, replacement of relay protection and automatics, communication devices, the construction of a control unit at Novokakhovska Substation and the installation of the fibre-optic system Novokakhovska - Kakhovska
- Constructing the diversion of the existing 330 kV Novokakhovska - Kherson line (2 x 15 km), incl. rehabilitation of the 330 kV Khersonska Substation, and the installation of the fibre-optic system from Kakhovska - Khersonska
intec's services
- Assistance to Ukrenergo during the tender stage (preparation of pre-qualification and tender documents, assistance during pre-qualification and tendering stages, and assistance in contract preparation)
- Technical and legal assistance during contracts' execution (review of the design and its compliance with the ESAP, supervision of contractors' works, assistance in project management, assistance during DLP)
- Assistance in loan agreement management (drafting of project implementation plan and all necessary reporting, assistance for disbursement to contractors)
- Assistance in the implementation of the ESAP/ESMPP
- Monitoring of the adherence to health and safety standards
Client
NEC UkrenergoFinancing
EBRDPeriod of implementation
07.2011 - 10.2016; 03.2018 – 08.2018Uganda - Independent Lenders' Advisor for a 10 MW PV Solar Project in Soroti District
The Netherlands Development Finance Company (FMO) invests into a 10 MW PV solar power project to be developed, owned and operated by the company Access Uganda Solar Limited. FMO contracted the services of a consultant to carry out lenders' technical, environmental and social due diligence of the project, construction supervision and monitoring of operational performance.
intec's services
The following Environmental and Social related services were provided in the framework of the project for a 10 MW PV Solar Project in Soroti District:
A. Due Diligence Phase
- Review of the project's environmental and social impact assessment (ESIA) process and report
- Preparation of a E&S Due diligence, including the review and assessment of corporate ESMS in relation to project construction and operation
- Summary of recommendations and proposed actions in a draft environmental and social action plan (ESAP)
B. Construction and Commissioning Phase
- Design review and approval, considering specific environment, social, health and safety requirements
- Verifying compliance with ESMMP
Client
Netherlands Development Finance Company ("FMO")Financing
Access Uganda Solar LimitedPeriod of implementation
03.2015 - 03.2018Mali - PASE - Extension of EDM's Transmission and Distribution Networks
The project was part of the ‘PASE’ (Project for the Support to the Energy Sector) for which the World Bank granted a loan to the Government of Mali. The project in general aimed at improving access to electricity, as well as efficiency in the supply and utilisation of electrical energy. The project’s technical measures included the following components:
- Extension of the MV/LV networks in Bamako and Kati
- Construction of the 30 kV Kati Substation
- Reinforcement and extension of the MV/LV networks in Kayes, Sikasso, Koutiala, and Ségou
- Rehabilitation of the 150 kV lines Bamako – Fana, Fana – Ségou, and restructuring of Fana substation connection from T-off to line-in/line-out arrangement
- Extension of the Kalabancoro Substation (transformer 60 MVA, 150/30 kV) and renewal of the 30/15 kV Sotuba Substation
- Extension of the 15 kV SOGEM Substation in Kodialani and installation of 15 kV outgoing feeders
- Installation of the second circuit on the 150 kV Kodialani - Sirakoro line
intec's services
- Overall project management and home-office back-up support for specific tasks
- Coordination of the detailed implementation plan with EDM
- Approval of technical documents and implementation studies
- Technical control of plans and documents
- Factory acceptance tests, monitoring and quality control of manufacturing
- Site supervision
- Budget control and management
- Implementation of the quality management plan and the health and safety plans
- Verification of the environmental protection plan
- Reporting
Client
Energie du Mali S.A. (EDM)Financing
International Development Association (IDA)Period of implementation
02.2014 - 07.2016Burkina Faso - Construction of MV lines (15, 20 and 33 kV) - Consulting Services for the Monitoring and Supervision of Works
The project includes the construction of some 1,200 km MV lines (15, 20 and 33 kV) with Almelec cables of various cross-sections as per the respective locations as well as the construction of about 300 km LV lines. The Consultant's services shall contribute to achieving the project's main objectives, i.e.
- the completion of the tender dossiers through additional studies,
- the selection of contractors,
- the review of plans and documents, final design and the supervision of works on site,
- monitoring of costs and of the adherence to the project planning,
- the establishment of professional and adequate work standards.
intec's services
- Management of the project (coordination with PRIELER; monitoring of contractors' contractual obligations, budget control, quality control, health and safety, environment protection, reporting).
- Contract award (additional design studies and completion of tender dossiers, participation in tender opening, in tender evaluation and in contract negotiations).
- Preparation of works (approval of technical documents, monitoring, coordination and review of final designs).
- Construction and installation (factory acceptance, monitoring, coordination and control of manufacturing, site supervision, control and coordination of construction works, commissioning and acceptance testing, preliminary acceptance of installations, review of operation and maintenance manuals, checking of materials and equipment lists, checking of as-built drawings.
- Project completion (final invoice; final acceptance of installations after the guarantee period).