Technical assistance and support to CGES' PIU in connection with the procurement process and construction / implementation of the following equipment and measures:
- Lot 1: construction of a 400/110/35 kV GIS substation and extension of an existing 400/220/110 kV substation
- Lot 2: construction of 35 km each of 400 kV double and single circuit lines, a 4 km diversion of an existing 110 kV line and the dismantling of 6 km of 400 kV line
- Lot 3: construction of 120 km of 400 kV transmission line (partly d.c.), one 5 km and one 6 km diversion of existing 110 kV lines, and the dismantling of 10 km of 110 kV line
Certain sections of the lines are in high-mountain regions (2,000 m above sea level).
intec's services
- Development of the PIU's operating procedures, the project implementation plan (PIP), a Project Procedures Manual and QA procedures
- Support to the PIU in the process of obtaining the required permits and approvals from relevant Montenegrin institutions
- Support during the procurement process (preparation of tender documents, launching of tenders, evaluation of bids, contract negotiations)
- Assistance with design review and approval and preparation of related comments/reports
- Planning of and attendance to Factory Acceptance Tests (FATs)
- Site supervision, monitoring and reporting
- Testing, commissioning and operational acceptance (planning and monitoring of testing procedures, review of contractors' test reports, preparation of acceptance certificates, instructions for operation)
- Assistance in the implementation of the Environmental and Social Action Plan
- Knowledge transfer (training of the PIU on reporting requirements from loan agreements, implementation of time- or progress-dependant elements such as insurance policies, general progress reporting, etc.
Client
Crnogorski Elektroprenosni Sistem AD (CGES)
Financing
European Bank for Reconstruction and Development (EBRD)
Period of implementation
11.9.2013 - 31.07.2018